Custom Event Fabrication NYC
CNC routing, metalwork, scenic carpentry, painting, and LED — six fabrication disciplines under one roof in NYC.
200+ projects delivered on time. Zero missed deadlines.
Get Your Free Quote
Describe your event build. We quote within 48 hours.
Six Fabrication Trades. One Roof. Zero Excuses.
Most fabrication shops outsource at least half the work. Your metal goes to one vendor, paint to another, LED to a third. Timelines slip. Quality varies. Nobody owns the outcome.
Our NYC shop runs six disciplines in-house: CNC routing, metal fabrication, scenic carpentry, painting, large-format printing, and LED integration. One team builds your entire project from raw material to finished install. That is how we deliver 200+ projects with zero missed deadlines.
The PUYB Difference
No Outsourcing
Every cut, weld, paint stroke, and pixel is done by our team in our shop. When something needs adjusting, we walk across the floor — not across town.
Engineering-First Approach
Full structural engineering and 3D modeling before fabrication begins. Your build is designed to be safe, transportable, and install-ready from day one.
NYC Speed, NYC Standards
We understand NYC venue requirements, union rules, load-in windows, and freight elevator constraints. We have built for every major venue in the city.
Concept to Strike
Design, engineering, fabrication, delivery, install, and teardown. One PO, one point of contact, one team that owns the entire project lifecycle.
From Brief to Build
Share your project details — dimensions, materials, venue, timeline. We deliver a detailed line-item quote and preliminary 3D concepts within 48 hours.
Full 3D renderings, material specifications, and engineering drawings. You sign off on every detail before production starts. Revisions included.
Your project moves through our NYC shop — CNC, metal, carpentry, paint, print, LED. Daily progress updates and photo documentation throughout.
Our crew handles logistics, delivery, on-site assembly, and final QC walkthrough. After the event, we manage teardown and removal.
“We needed a full scenic build for a product launch at a Manhattan venue — custom metalwork, LED-backlit panels, and branded fixtures. PUYB handled everything in-house and the install was flawless. They are the only fabrication shop we call now.”VP of Events Fortune 500 Consumer Brand
Fabrication <em>Capabilities</em>
Fabrication FAQs
We build for brand activations, product launches, corporate events, galas, trade shows, experiential marketing campaigns, retail pop-ups, and immersive installations. If it needs to be designed, built, and installed — we do it.
We provide detailed line-item quotes based on materials, labor, complexity, and timeline. Most event fabrication projects range from $10,000 to $200,000+. We quote within 48 hours of receiving your brief — no obligation, no surprises.
Absolutely. We accept files in AutoCAD, SketchUp, Vectorworks, Adobe Illustrator, and most standard formats. We can also engineer and detail your concept drawings into production-ready files.
Standard fabrication runs 3-8 weeks depending on project scope. Rush timelines of 1-2 weeks are possible for simpler builds. We recommend reaching out as early as possible to lock in your production slot.
Yes. While our shop is in NYC and we serve the tri-state area daily, we regularly ship and install projects across the US. Our install crews travel with the build to ensure quality from shop to venue.
We design for your needs. Touring builds are engineered with modular connections, road cases, and assembly guides. One-time installations are optimized for impact and cost efficiency. We will discuss durability requirements during the quoting phase.