56 W 36th St, Suite 605, New York, NY 10018
(800) 670-0462
Home Event Fabrication Experiential Design Creative Fabrication Immersive Production Work About Contact Start a Project
Services

Stage & Scenic Fabrication

Custom stage design and scenic fabrication for live events, galas, award shows, corporate conferences, brand activations, and productions — from scenic carpentry and metalwork to scenic painting and LED integration. Every element designed and built in-house at our New York City fabrication shop by a team trained in the city that sets the standard for stagecraft.

Stage & Scenic Fabrication — featured project

The audience never sees the engineering — they just know the room feels different the moment they walk in.

What It Is

Scenic fabrication that earns the standing ovation.

Scenic fabrication is the discipline of designing and physically constructing the custom environments, stage sets, backdrops, dimensional elements, and branded structures that transform an empty venue into an experience worth remembering. It encompasses scenic carpentry, metalwork, CNC routing, sculpting, scenic painting, large-format graphics, and lighting integration — all engineered for structural integrity, visual impact, and the fast install-and-strike windows that live events demand. Pop Up Your Brand handles every phase of scenic fabrication in-house at our New York City shop, from concept sketches to finished builds ready for the stage.

New York City is where scenic fabrication was born — on Broadway stages, in television studios, and across the most demanding event venues in the country. We carry that tradition into every project. Our scenic carpenters, metal fabricators, painters, and installers work under the same roof as our designers, which means every concept we present has already been vetted for buildability, material performance, and installation logistics. When the approved render leaves our screen and enters our shop, nothing gets lost in translation. That is the difference between a scenic fabrication company that designs and builds, and one that designs and outsources.

What's Included

Full-service scenic fabrication — every craft, one shop.

Scenic Carpentry & Custom Structures

Walls, flats, platforms, risers, archways, columns, bars, DJ booths, reception desks, and freestanding scenic structures — built from raw lumber and sheet goods to finished scenic elements. Engineered for structural load, designed for visual drama, and built for fast assembly on-site.

Metal Fabrication & Welding

Steel and aluminum structures, custom trussing, freestanding frames, cantilevered elements, and sculptural metalwork. AWS-certified welding, powder coating, brushed and painted finishes — all fabricated to spec and load-tested before leaving our shop.

CNC Routing & Dimensional Elements

Precision-cut logos, dimensional lettering, decorative panels, relief carvings, and complex geometric structures in wood, acrylic, foam, and composite materials. Every element cut to spec on our CNC router and hand-finished by our scenic team.

Scenic Painting & Finishing

Color-matched brand finishes, faux textures — marble, woodgrain, stone, aged metal — trompe l'oeil effects, gilding, glazing, and high-gloss lacquer work. Our scenic painters bring surfaces to life with the theatrical-grade craft that separates custom fabrication from rented décor.

Backdrops, Soft Goods & Graphics

Painted and printed backdrops, fabric tension displays, SEG graphics, step-and-repeats, wall wraps, and hanging banners — produced and finished by the same team that built the structure they hang on. Consistent quality from frame to fabric.

Lighting & LED Integration

Backlit signage, LED edge-lighting, programmable color-wash systems, integrated video wall framing, and architectural uplighting — designed into the scenic build from day one. Lighting that is part of the scenery, not clamped to it.

Go Deeper

NYC Scenic Heritage. Event-Industry Precision.

New York City has been the epicenter of scenic fabrication since the earliest days of Broadway — IATSE Local One has been building, installing, and operating scenery in this city since 1886. That heritage created an unmatched talent pool of scenic carpenters, painters, metalworkers, and installers. Our team was trained in that ecosystem, and we bring theatrical-grade craftsmanship to every corporate event, gala, and brand activation we build. The finish quality, structural rigor, and attention to detail that Broadway demands is the baseline in our shop — not the exception.

Designed to Build. Built to Match.

The most common failure in scenic fabrication is the gap between what a designer envisions and what a fabrication shop delivers. Materials photograph differently than they render. Structural connections create visual lines the designer did not anticipate. Paint finishes shift under event lighting. We close that gap by involving our fabrication team during the design phase — not after it. Materials are sampled, finishes are tested under lighting conditions, and structural methods are validated before the first presentation. The result is scenic work that matches the approved render because it was engineered to match from the start.

Every Craft Under One Roof

Most scenic fabrication projects require four or five trades — carpentry, metalwork, CNC cutting, scenic painting, and graphics. When those trades are spread across separate vendors, the project becomes an exercise in coordination, not craftsmanship. In our shop, the carpenter building the wall talks directly to the painter finishing it and the metal fabricator building the frame behind it. Problems are solved in conversations, not change orders. Timelines compress because work runs in parallel, not in sequence. Quality stays consistent because one team owns the standard.

Built for the Load-In Window

A scenic build is only as good as its ability to assemble on-site within the time the venue gives you — and in New York City, that window is never generous. We engineer every scenic element for fast, sequenced installation: labeled components, pre-wired lighting, modular connections, and assembly documentation that eliminates guesswork on the venue floor. Our crew pre-assembles and tests every build in our shop before it ships. When we walk into the venue, we are rebuilding something we have already built — not building it for the first time.

Who It's For

Built for the teams that build the moment.

Our stage and scenic fabrication services are built for teams that need a fabrication partner who understands live events — the tight timelines, the unforgiving load-in windows, and the reality that the audience sees every detail. Whether you are a producer staging a gala, an agency activating a brand, or a corporate team launching a product, we bring the craft and the crew.

Event Producers & Planners

Custom stage sets, scenic environments, backdrops, and branded structures for galas, award shows, fundraisers, corporate conferences, and live performances — fabricated to your design spec and installed by the team that built it.

Creative & Experiential Agencies

We function as your scenic fabrication shop — white-label, behind the scenes. You own the creative direction and client relationship. We build exactly what you designed, with the finish quality and structural integrity your reputation depends on.

Brand Marketing & Corporate Teams

Stage builds, branded environments, product launch sets, and immersive scenic elements for corporate events, shareholder meetings, press conferences, and experiential campaigns — designed to your brand standards and engineered for impact.

How We Work

From concept sketch to curtain up.

Step 01

Creative Brief & Site Assessment

You share the event vision, venue details, timeline, and budget. We evaluate the space — ceiling heights, load-in access, rigging points, power capacity, and any union or venue restrictions — and deliver a detailed scope, material plan, and quote within 48 hours.

Step 02

Design & Visualization

Our team develops scenic concepts, spatial layouts, material palettes, and photorealistic 3D renderings. You see every finish, sightline, and lighting condition before fabrication begins. Our fabrication team reviews every concept for buildability and installation logistics during the design phase — not after.

Step 03

Fabrication & Pre-Assembly

Scenic carpentry, metalwork, CNC routing, scenic painting, graphics production, and lighting integration — all running simultaneously in our shop. Every build is pre-assembled and inspected in our facility before crating. The scenic environment your audience experiences has already been built once in our shop.

Step 04

Installation & Strike

Our crew handles delivery, sequenced on-site assembly, lighting hookup, scenic detailing, and final walkthrough. We stay through event open for any adjustments. After the event, we manage strike, load-out, and venue restoration — leaving the space exactly as we found it.

Common Questions

FAQ

Scenic fabrication is the process of designing and physically constructing custom sets, stages, backdrops, dimensional elements, and branded environments for live events, theater, film, TV, and experiential marketing. It encompasses scenic carpentry, metal fabrication, CNC routing, sculpting, scenic painting, and finishing — transforming creative concepts into three-dimensional built environments. Pop Up Your Brand is a scenic fabrication company in New York City that handles every phase in-house, from concept development through installation and strike.

Scenic fabrication costs depend on project scope, materials, complexity, and installation logistics. Simple scenic elements like branded photo ops or dimensional signage typically start at ,000 to ,000. Mid-scale projects such as custom stage sets or event backdrops range from ,000 to ,000. Large-scale immersive scenic environments, full stage builds for galas and conferences, or touring installations can range from ,000 to ,000 or more. Pop Up Your Brand provides detailed, line-item quotes within 48 hours.

Scenic design is the creative and conceptual phase — developing the visual direction, spatial layouts, material selections, and renderings that define what the environment will look and feel like. Scenic fabrication is the physical construction — turning those designs into built reality through carpentry, metalwork, painting, and finishing. Pop Up Your Brand handles both under one roof, which means the design is always engineered for buildability and the build always matches the design.

Timelines depend on project scope and complexity. Simple scenic elements and branded builds typically require 3 to 4 weeks from approved concept to delivery. Mid-scale stage sets and scenic environments take 4 to 8 weeks. Large-scale builds with multiple scenic elements, custom painting, and LED integration require 8 to 14 weeks. Because all fabrication happens in-house at our New York City shop, we consistently compress timelines compared to companies that outsource trades to separate vendors.

Pop Up Your Brand provides stage and scenic fabrication for corporate conferences, galas, award shows, fundraisers, product launches, brand activations, fashion shows, concerts, trade shows, experiential marketing campaigns, and private celebrations. We serve clients across New York City and nationwide, building everything from single scenic elements to full-venue transformations with custom staging, scenic painting, lighting integration, and branded environments.

Let's Talk

Let's build your stage.

Tell us about your event, your venue, and your vision — and we'll come back with a scenic concept, material plan, and quote within 48 hours. One team from sketch to spotlight.