Skip to content
Fabrication team in workshop with completed build

About Pop Up Your Brand

NYC-based experiential fabrication shop. Design, build, install — all in-house, all under one roof. 200+ projects. Zero missed open dates.

We Started in the Shop

Pop Up Your Brand was founded by fabricators — not marketers, not consultants, not MBAs. We started with tools in our hands and sawdust on our boots, building custom environments for brands that needed flawless physical experiences delivered on impossible timelines.

That origin shapes everything about how we work today. We don’t outsource fabrication because we ARE fabrication. Our leadership team has hands-on experience with every discipline in our shop: CNC routing, scenic carpentry, metal welding, scenic painting, large format printing, and LED integration. When a client asks “can you build this?” we don’t call a subcontractor to find out — we already know the answer.

Today, we’re a full-service experiential fabrication shop in New York City with a growing team and a 200+ project track record. But the culture hasn’t changed: we’re builders first, and every decision we make — from hiring to scheduling to material selection — reflects that identity.

Professional event fabrication workshop interior

The numbers behind the builds.

200+ Projects Delivered
0 Missed Open Dates
6 In-House Disciplines
48hr Quote Turnaround

What Drives Us

✦

Craft Over Shortcuts

We don't cut corners because we know what corners look like when they're cut. Every joint, every finish, every connection is done right — because our name is on it and our crew is the one installing it in front of your client.

✦

Deadlines Are Sacred

Events open on time or they don't open at all. That reality drives every schedule we build, every decision we make, and every late night our team pulls to guarantee your doors open on time. 200+ projects, zero misses.

✦

One Team, Full Pipeline

The person who designs your project sits next to the person who builds it, who rides in the truck with the person who installs it. This isn't a philosophy — it's our floor plan. Continuity eliminates problems.

✦

Partners, Not Vendors

We don't just build what you send us — we help you figure out the best way to build it. Material alternatives that save budget without sacrificing quality. Engineering solutions that solve problems you didn't know existed. That's partnership.

The Shop

Our NYC fabrication facility houses every capability we offer: a CNC router, a fully equipped metal shop with TIG and MIG welding, a scenic carpentry workshop, a paint booth for brand color matching and specialty finishes, a large format print station, and a lighting integration bench. Every tool, every material, and every team member under one roof.

This isn’t just convenient — it’s how we control quality, compress timelines, and eliminate the communication breakdowns that plague multi-vendor projects. When your project is in our shop, we can walk you through every phase in person. Clients visit regularly to see their builds taking shape — and to experience the confidence that comes from watching the same team handle every step.

Professional event fabrication workshop interior

Built by builders.

Founded by fabricators. Powered by craft. Driven by deadlines.

BUI

Let's build something together.

We'd love to hear about your next project.

Get in Touch