
All Services
Seven service categories. Six fabrication disciplines. One team. Pick the service that matches your project — or send us the brief and we'll route it.
One Shop, Every Discipline
Every Pop Up Your Brand project runs through the same in-house pipeline: concept and 3D design, engineering, fabrication across six trades, delivery, installation and strike. The difference between our services is what you're building, not who builds it.
Where to start: custom builds for launches, galas and corporate events → Event Fabrication. Booths and exhibits → Trade Show Fabrication. Product launches, photo moments and interactive installs → Brand Activations. Retail and touring pop-ups → Pop-Up Shop Design. Stages, backdrops and scenic → Stage & Scenic. Full brand experiences, concept to strike → Experiential Fabrication. Concept and renderings first → Experiential Design. On-site production → Immersive Production.

Our Services
Seven services, one in-house team. Choose by what you're building.
Experiential Design
Concept development, 3D visualization, spatial design, and fabrication-ready CAD drawings. Every design is engineered for buildability from the first sketch.
Event Fabrication Services
CNC cutting, scenic carpentry, metal fabrication, scenic painting, large format printing, and LED integration. Six in-house disciplines, zero subcontractors.
Brand Activations
Product launches, interactive installations, and photo moments built to stop crowds, drive social sharing, and deliver measurable brand impact.
Trade Show Fabrication
Custom exhibits and modular booth systems for convention show floors nationwide. Engineered for reuse, designed to dominate.
Pop-Up Shop Design & Fabrication
Retail-grade pop-up environments that look permanent, install in a day, and can tour to multiple markets.
Immersive Production
Full-service event production from load-in to strike. Venue coordination, labor management, and on-site execution by the team that built your project.
Built by PUYB
View All Work
A New York Stoop for the GLAAD NYC Gala at Cipriani 25 Broadway

Ziploc Surprise Seconds: A Custom Fridge and Prize Wheel on the Streets of NYC

SDG Signage, Floor Branding and a Photo Moment for UNGA Week at UN Headquarters

Raising Cane's Private Party at Zero Bond, NYC

Café de Colombia at the San Diego Convention Center

Magic Hour Mountain Lodge at Moxy NYC
Let's build something worth talking about.
Tell us about your project. Quote in 2 business days.
Start Your Project