
Stage & Scenic Fabrication NYC
Custom stage builds, scenic walls, backdrops, and set pieces for live events, concerts, hospitality venues, and productions. Designed and fabricated in-house at our New York shop.
Scenic That Sets the Stage
Scenic fabrication is the craft of building custom physical environments for live events — stages, backdrops, scenic walls, set pieces, bars, DJ booths, and architectural elements that define the visual identity of an experience. At Pop Up Your Brand, scenic fabrication is one of our core disciplines.
Our shop handles every scenic element in-house: CNC-cut dimensional pieces, welded steel structures, scenic carpentry, painted finishes, printed graphics, and integrated lighting. Whether you need a 40-foot scenic wall for a nightclub opening or a branded stage set for a corporate keynote, we fabricate to spec and install on schedule.
We’ve built scenic elements for venues and clients including Delilah, TAO Group, Moxy Hotels, and major live event productions across NYC.

From Nightclubs to Keynotes
Scenic fabrication spans two very different worlds: entertainment venues where the set IS the experience, and corporate events where the stage supports a speaker, a product, or a message. Most scenic shops are good at one. We’re built for both.
For hospitality and nightlife clients — venues like Delilah, TAO, and Moxy Hotels — we build permanent scenic installations that define the identity of a space. These are pieces that need to look spectacular under dramatic lighting, withstand nightly use, and maintain their finish quality for years. The materials, joinery, and coating systems we use are commercial-grade, not event-grade.
For corporate and brand events, we build stage sets, scenic walls, and branded environments that communicate authority and craft. A CEO delivering a keynote in front of a cheap-looking backdrop undermines the message. A precision-fabricated stage set with dimensional elements, integrated lighting, and brand-perfect finishes elevates it. The audience may not consciously notice the build quality — but they feel it.
What connects both worlds is craft. Whether we’re building a DJ booth for a Brooklyn nightclub or a 60-foot scenic wall for a Fortune 500 product launch, the same standards apply: flawless finishes, structural integrity, and on-time delivery. Because in scenic fabrication, the work is the first thing the audience sees — and it sets the tone for everything that follows.

From Concept to Curtain
We discuss your event vision, venue specs, and brand requirements. Our design team translates your ideas into buildable concepts within 48 hours.
3D renders and fabrication drawings show your scenic elements in full detail — materials, finishes, lighting, and placement within your venue.
CNC cutting, carpentry, welding, painting, and graphic application happen simultaneously in our New York shop. Full pre-assembly and QC before delivery.
Our crew delivers and installs your scenic elements on-site — typically overnight for hospitality venues or during dedicated load-in windows for events.
Scenic Elements We Build
Scenic Capabilities
Two core scenic disciplines — both built in-house from raw materials to finished install.
Custom Stage Builds
Engineered stage platforms, risers, catwalks, and performance structures built to hold weight, look spectacular, and install fast. From intimate DJ platforms to concert-grade staging.
Backdrops & Scenic Walls
Custom scenic walls, dimensional backdrops, branded environments, and architectural elements that transform spaces. CNC-cut, hand-painted, or digitally printed.
Why Choose PUYB for Scenic
Event + Permanent
We build both temporary event scenic and permanent venue installations. Whether your project lives for one night or one decade, we engineer it to the appropriate standard — and over-build for safety in both cases.
Finish Obsession
Scenic is all about the surface. Our paint team does precision Pantone matching, faux wood grains, metallic effects, patina treatments, and specialty textures. Every finish is approved against your brand standards before it leaves the shop.
Overnight Install
For venue installations, we typically install overnight or during closed hours. For events, we work within your load-in window. Either way, your space is ready when the doors open — no disruption to operations.
Structural Engineering
Every stage and scenic structure is engineered for load capacity, seismic requirements (where applicable), and fire code compliance. We provide stamped engineering drawings when required by venues or jurisdictions.
Scenic Builds
View All Work
Raising Cane's Private Party at Zero Bond, NYC

A New York Stoop for the GLAAD NYC Gala at Cipriani 25 Broadway

A Full-Scale Barney Greengrass Deli, Built for One Night

ONE LOVE: Celebrating Pride Above New York City

Delilah x hwoodgroup
Frequently Asked Questions
Scenic fabrication is the process of designing and physically constructing custom sets, stages, backdrops, dimensional elements, and branded environments for live events, theater, film, TV, and experiential marketing. It encompasses scenic carpentry, metal fabrication, CNC routing, sculpting, scenic painting, and finishing — transforming creative concepts into three-dimensional built environments. Pop Up Your Brand is a scenic fabrication company in New York City that handles every phase in-house, from concept development through installation and strike.
Scenic fabrication costs depend on project scope, materials, complexity, and installation logistics. Projects in our shop start at $10,000, and most land at $25,000 and up. Custom stage sets, event backdrops, full stage builds for galas and conferences, and touring scenic installations are priced from your drawings, venue and schedule. Pop Up Your Brand provides detailed, line-item quotes within 2 business days.
Scenic design is the creative and conceptual phase — developing the visual direction, spatial layouts, material selections, and renderings that define what the environment will look and feel like. Scenic fabrication is the physical construction — turning those designs into built reality through carpentry, metalwork, painting, and finishing. Pop Up Your Brand handles both under one roof, which means the design is always engineered for buildability and the build always matches the design.
Timelines depend on project scope and complexity. Simple scenic elements and branded builds typically require 3 to 4 weeks from approved concept to delivery. Mid-scale stage sets and scenic environments take 4 to 8 weeks. Large-scale builds with multiple scenic elements, custom painting, and LED integration require 8 to 14 weeks. Because all fabrication happens in-house at our New York shop, we consistently compress timelines compared to companies that outsource trades to separate vendors.
Pop Up Your Brand provides stage and scenic fabrication for corporate conferences, galas, award shows, fundraisers, product launches, brand activations, fashion shows, concerts, trade shows, experiential marketing campaigns, and private celebrations. We serve clients across New York City and nationwide, building everything from single scenic elements to full-venue transformations with custom staging, scenic painting, lighting integration, and branded environments.
The set is the first impression. Make it count.
Custom scenic fabrication for stages, venues, and brands.
Let's set the scene.
Custom scenic fabrication — from sketch to stage, all under one roof.
Get a Quote