56 W 36th St, Suite 605, New York, NY 10018
(800) 670-0462
Home Event Fabrication Experiential Design Creative Fabrication Immersive Production Work About Contact Start a Project
Experiential Fabrication & Production

We Build What Others Only Imagine.

Full-service experiential fabrication and event production for creative agencies and global brands. Concept to construction — in-house, on time, every time.

Pop Up Your Brand — featured installation
Experiential Design Creative Fabrication Immersive Production Brand Activations Trade Show Builds Pop-Up Installations Built by Pop. Experiential Design Creative Fabrication Immersive Production Brand Activations Trade Show Builds Pop-Up Installations Built by Pop.

Trusted by agencies and brands worldwide

What We Do

Three Ways We Build.

Everything in-house. No outsourced fabrication, no vendor chains, no lost-in-translation moments. When you bring us the brief, we own it all the way to the open.

01 / Experiential Design

Experiential Design

From concept brief to fabrication-ready drawings. We translate brand strategy into three-dimensional environments that audiences step into and never forget.

  • Spatial Layouts
  • Material Selection
  • Design Development
  • Fabrication Drawings
  • 3D Visualization
  • Art Direction
02 / Creative Fabrication

Creative Fabrication

CNC, metalwork, scenic painting, custom builds — all under one roof. No outsourced vendors, no quality guesswork, no delays.

  • CNC & Laser Cutting
  • Scenic Carpentry
  • Metal Fabrication
  • Vinyl & Large Format
  • Scenic Painting
  • Structural Engineering
03 / Immersive Production

Immersive Production

Site surveys, logistics, load-in, install, strike. We manage every moving piece so your open happens on time, flawlessly.

  • Site Management
  • Logistics Planning
  • Load-In Coordination
  • On-Site Installation
  • Live Event Support
  • Strike & Deinstall
Experiential Design
Creative Fabrication
Immersive Production
Work in progress — fabrication floor
The Proof

Numbers That Mean Something.

Every stat is earned on the shop floor. No outsourced fabrication. No missed deadlines. No vendor chains. Just a team that builds what it designs and installs what it builds.

200+ Projects Delivered
0 Missed Opens
100% In-House Fabrication
48hrs Quote Turnaround
How We Work

From Brief to Built. Four Steps.

Step 01

Brief

You share the creative vision, budget, and timeline. We ask the questions your vendors never do — load-in access, union rules, ceiling heights, material lead times. Within 48 hours you have a detailed scope and quote.

Step 1 — Brief
Step 02

Design

Our experiential designers translate the brief into spatial layouts, material specs, and fabrication-ready drawings. You see 3D renders before a single sheet of plywood is cut.

Step 2 — Design
Step 03

Fabricate

CNC, scenic carpentry, metalwork, large-format print, scenic painting — all under one roof. No outsourced vendors means tighter quality control and faster turnaround.

Step 3 — Fabricate
Step 04

Install

Our crew handles logistics, load-in, on-site assembly, and strike. Zero missed opens since founding — that's not a boast, it's a production philosophy baked into every timeline.

Step 4 — Install
Who We Work With

Who We Work With

We build for creative agencies, brand teams, event producers, and anyone who needs physical brand environments that look as good in person as they do in the pitch deck.

Creative Agencies

We're your fabrication department. You own the client, we own the build. No competing, no poaching.

Brand Teams

Direct partnerships for in-house marketing teams who need a production partner that speaks their language.

Event Producers

Stage builds, scenic elements, and custom structures for live events, festivals, and experiential campaigns.

Agencies: We're your fabrication department.

Pop Up Your Brand works as a silent production partner for agencies — you own the client, we own the build. No competing, no poaching. Just flawless physical execution that makes your creative look exactly like the deck promised.

Let's Talk
Common Questions

Everything You Need to Know.

Answers to the questions agencies and brands ask us most.

Experiential fabrication is the physical construction of brand environments, installations, and immersive spaces for events, activations, and retail. It bridges creative design with hands-on manufacturing to produce three-dimensional brand experiences that audiences walk into and remember. Pop Up Your Brand specializes in this — designing and building every element in-house, from concept to installation.

Pop Up Your Brand is a full-service experiential fabrication and event production company. We design, build, and install brand environments, trade show booths, pop-up activations, retail installations, and immersive experiences. Everything is done in-house — no outsourced vendors, no middlemen.

Yes — this is a core part of how we operate. We function as a fabrication and production partner to agencies, meaning your agency leads the client relationship while we deliver the physical build. Your clients never know we exist unless you want them to.

Yes. All fabrication — CNC cutting, scenic carpentry, metalwork, large-format printing, scenic painting — is done by our in-house team. No outsourcing, no vendor miscommunication, tighter quality control, and faster turnaround than competitors who rely on third-party shops.

Timelines vary by scope. Simple pop-ups and activations: 3–6 weeks. Mid-scale brand environments: 6–10 weeks. Complex multi-element builds: 10–16 weeks. Our in-house fabrication capability lets us compress timelines that other companies cannot.

Let's Talk

Let's build something worth talking about.

Tell us about your project and we'll come back with a scope, timeline, and quote within 48 hours.

    Contact Pop Up Your Brand