Skip to content
IBS trade show booth built by Pop Up Your Brand, Las Vegas

Event Fabrication in Las Vegas

Pop Up Your Brand brings NYC fabrication quality to the Las Vegas convention and event market. Every structure is designed and built in the PUYB shop, then shipped and installed by experienced crews who know the Strip's venues, union rules, and dock schedules.

LVCCMandalay BayThe Venetian ExpoWynn Las VegasMGM Grand

New York Built, Vegas Installed

Las Vegas hosts the largest trade shows and brand activations in the world, and the fabrication demands match that scale. Pop Up Your Brand operates on a build-in-NYC, install-in-Vegas model that gives clients access to East Coast craftsmanship and West Coast venue expertise in a single partner. Structures are engineered and fabricated in the PUYB shop, crated for cross-country freight, and installed by traveling crews who have worked every major convention center on the Strip.

The Las Vegas Convention Center, Mandalay Bay, and The Venetian Expo each have their own union jurisdictions, dock scheduling systems, and rigging regulations. Navigating those systems requires a fabricator that has done it before — repeatedly. PUYB has delivered 25+ Vegas builds across CES, SEMA, IBS, and dozens of proprietary brand events, learning the dock-time penalties, labor call structures, and material handling protocols that separate a smooth install from a six-figure overage.

Booth install inside a Las Vegas convention hall

Vegas Fabrication Services

Focused on trade show dominance and large-scale convention builds — fabricated in New York, installed on the Strip.

Trade Show Fabrication

Island booths, inline exhibits, and custom displays engineered for Las Vegas convention centers. Union labor coordination and marshaling included.

Island BoothsInline ExhibitsHanging SignsModular Systems
Learn More

Event Fabrication

Custom-built structures for Vegas brand events, product launches, and hospitality activations. New York shop quality delivered to the Strip.

CNC RoutingWoodworkingMetal FabricationLarge-Format Print
Learn More

Experiential Design

Concept-to-rendering design for Las Vegas trade show exhibits and experiential activations, mapped to specific venue floor plans.

3D RenderingSpatial PlanningBrand EnvironmentsVenue Adaptation
Learn More

Immersive Production

Full-sensory environments for Vegas brand experiences — projection mapping, interactive tech, and themed installations that compete with the Strip itself.

Sensory EnvironmentsProjection MappingInteractive TechThemed Installations
Learn More

Vegas Venues We've Built In

Las Vegas Convention Center

3.2M sf, largest convention center in the US. Union labor required, advanced rigging available. Dock scheduling is competitive during CES and SEMA — book early.

The Strip•Convention Center

Mandalay Bay Convention Center

1.7M sf combined with attached hotel. Complex dock scheduling with multiple show overlaps. PUYB pre-coordinates freight timing to avoid dock-queue penalties.

The Strip•Convention/Hotel

The Venetian Expo

2.25M sf, formerly Sands Expo. Premium exhibit space with high ceilings and strong rigging points. Popular for tech and healthcare trade shows.

The Strip•Convention Center

Wynn Las Vegas

Intimate ballrooms with high-end finishes and strict brand standards. All fabrication materials and graphics must meet Wynn's aesthetic approval process.

The Strip•Luxury Hotel

MGM Grand Conference Center

850K sf with multiple halls and good dock access. Versatile space that handles everything from mid-size exhibits to large-scale corporate events.

The Strip•Convention/Hotel

NYC craftsmanship, delivered to the Las Vegas Strip.

200+Projects Delivered
0Missed Opens
AllMajor Venues
NYC→LVBuilt & Installed

Event Fabrication in Las Vegas — FAQ

Let's build something in Las Vegas.

New York-built, Vegas-installed. PUYB brings fabrication shop quality to the biggest stages on the Strip. Get a quote in 2 business days.

Start Your Project