Skip to content

Nov 11, 2026

NYC Trade Shows 2027: A Javits Calendar With Build Deadlines

Every 2027 Javits trade show with its official dates, plus the day a custom booth design has to lock for each at 15, 30 and 40 business days of shop time, and what each kind of show asks of the build.

Nov 11, 2026

Sponsorship Activation: Five Footprints and a Season Kit

What a sponsor builds inside the footprint its contract grants: what the rights holder controls, five footprint types and the build behind each, a kit reused across a season, and a dated lock calendar for a 2027 Los Angeles expo.

Nov 08, 2026

Custom Trade Show Booth Cost: What Each Size Runs in 2027

Custom booths built in our shop start at $10,000. Our 2027 build ranges by size, the show-side lines billed outside the build, and how reuse lowers the cost per show.

Nov 06, 2026

20×30 Trade Show Booth: Peninsula and Island Build Guide

How a 20×30 trade show booth gets planned and built: island or peninsula, four layouts for 600 sq ft, the meeting room ceiling decision, venue rules and one kit that breaks down to a 20×20 and a 10×20.

Nov 05, 2026

SAPO Permits for NYC Street Activations: How the Build Fits

Which NYC permit a branded street, sidewalk, plaza or park activation needs, what the city charges, how early to apply, and how the build is designed to fit the permit.

Nov 04, 2026

Sales Kickoff Stage and Set: A January SKO Build Plan

A January or February sales kickoff needs four builds in one design system. Here is when your design has to lock for your load-in date, what the shop does each week after that, and what to settle with the hotel.

Nov 03, 2026

Runway Stage Fabrication: Building a Runway for NYFW

How a runway stage gets built for a February fashion show in New York: shape, deck height, load ratings, surfaces that photograph, lit fascia, risers, load-in and the date to lock the design.

Nov 03, 2026

Pop-Up Shop in Los Angeles: Permits, Districts and Freight

Planning a pop-up shop in Los Angeles from New York? Which of four cities governs your block, the City of LA permits and sign limits, California fire and accessibility rules, and how a store built in our New York shop arrives on time.

Nov 02, 2026

Rooftop Activation Fabrication in NYC: Building Where You Cannot Drill

How branded environments get built on New York roof decks with no penetrations: what the site survey has to capture, how ballast and bracing replace fasteners, what weather does to finishes, and how a rooftop build reaches the deck and leaves without a trace.

Nov 01, 2026

Modular Pop-Up Shops: One Store Built for Many Stops

How a modular pop-up shop gets engineered to open, strike and reopen: module plans, hardware that survives 15 to 25 install cycles, panels sized to the truck and the door, crew documents, per-stop changes and refurbishment.